Local 14 Wage Scale from 07.01.2026 through 06.30.2027

STEEL ERECTION

 

40 Hour Week 7/1/26 to 6/30/27

 

Straight *Off-Shift

 

Time Time

 

Three Drum Derricks …………………………………$103.35 $165.36

 

Cranes, 2 Drum Derricks, Hydraulic

 

Cranes, Fork Lifts, Boom Trucks…………………$ 99.29 $158.86

 

Compressors, Welding Machines,

 

Bridge Inspection Machines (Moog

 

And Machines of similar nature) …………………$ 54.73 $ 87.57

 

Compressors – Public Works Only

 

(Not combined with Welding Machine)………..$ 52.08 $ 83.33

 

*Off-Shift rate applies to public works projects only

 

CRANES: Crawler or Truck

 

100’ to 149’ Boom……………………$2.25 Per Hour Additional to

 

above Crane Rates

 

150’ to 249’ Boom……………………$2.50 Per Hour Additional to

 

above Crane Rates

 

250’ to 349’ Boom……………………$2.75 Per Hour Additional to

 

above Crane Rates

 

350’ to 450’ Boom……………………$3.25 Per Hour Additional to

 

above Crane Rates

 

Tower Crane……………………………$2.50 Per Hour Additional to

 

above Crane Rates

 

BUILDING WORK

 

35 Hour Week 7/1/26 to 6/30/27

 

Double Drum (Rigging Cont. Assoc.)………………………….. $ 94.79

 

Stone Derrick, Cranes, Hydraulic

 

Cranes, Boom Trucks…………………………………………………$100.43

 

Lead Engineer/Working Steward…………………………………$ 88.16

 

Dismantling and Erection of Cranes,

 

Relief Engineer …………………………………………………………$ 82.68

 

4 Pole Hoists, Single Drum Hoists ………………………………$ 81.79

 

Fork Lifts, Plaster (Platform Machine),

 

Plaster Bucket, Concrete Pump and all other

 

equipment used for hoisting material……………………………$ 74.34

 

House Cars and Rack & Pinion …………………………………..$ 64.87

 

House Cars (New Projects)…………………………………………$ 51.61

 

Compressors, Welding Machines (Cutting

 

Concrete-Tank Work), Paint Spraying, Sand

 

Blasting, Pumps (with the exclusion of Concrete

 

Pumps), All Engines Irrespective of Power (Power-Pac)

 

Used to drive auxiliary Equipment, Air, Hydraulic,

 

Etc., Boilers, Jacking System………………………………………$ 55.45

 

CRANES: Crawler or Truck

 

100’ to 149’ Boom……………………$1.75 Per Hour Additional to

 

above Crane Rates

 

150’ to 249’ Boom……………………$2.00 Per Hour Additional to

 

above Crane Rates

 

250’ to 349’ Boom……………………$2.25 Per Hour Additional to

 

above Crane Rates

 

350’ to 450’ Boom……………………$2.75 Per Hour Additional to

 

above Crane Rates

 

Tower Crane……………………………$2.00 Per Hour Additional to

 

above Crane Rates

 

BENEFITS

 

The following Fringe Benefits will be added to all classifications:

 

July 1, 2026

 

BENEFITS PER HOUR PAID

 

1 & 2 ANNUITY VOLUNTARY…………….. $ 4.50 Per Hour

 

ANNUITY …………………………………………$ 10.50 Per Hour

 

2 UNION ASSESSMENT ……………………. $ 2.53 Per Hour

 

TRAINING PROGRAM ……………………..$ 1.15 Per Hour

 

WELFARE………………………………………… $ 18.00 Per Hour

 

2 DEFENSE FUND…………………………….. $ 0.10 Per Hour

 

* LMCTF …………………………………………..$ 0.25 Per Hour

 

BENEFITS PER HOUR WORKED

 

PENSION…………………………………………..$ 6.30 Per Hour

 

1 Includes $0.05 or such other amount which may be voluntarily

 

allocated to the Local 14-14B Voluntary Political Action Committee

 

(VPAC).

 

2 Taxable Fringes (Taxable fringes are added to the gross wages and

 

then deducted from the net pay.)

 

* IUOE Local 14-14B Labor Management Cooperation Trust Fund.

 

July 1, 2026

 

“S” STAMPS (Straight -Time)

 

Hours Taxable Non-Taxable Total Value

 

S-40 $ 285.20 $1,448.00 $1,733.20

 

S-35 $ 249.55 $1,267.00 $1,516.55

 

S-8 $ 57.04 $ 289.60 $ 346.64

 

S-7 $ 49.91 $ 253.40 $ 303.31

 

S-1 $ 7.13 $ 36.20 $ 43.33

 

S-1/2 $ 3.57 $ 18.10 $ 21.67

 

“D” STAMPS (Double-Time & Off-Shift)

 

D-5 $ 71.30 $ 330.50 $ 401.80

 

D-1 $ 14.26 $ 66.10 $ 80.36

 

D-1/2 $ 7.13 $ 33.05 $ 40.18

 

INTERNATIONAL UNION OF

 

OPERATING ENGINEERS

 

Local Union 14-14B

 

Affiliated with the

 

AFL-CIO

 

159-18 Northern Boulevard

 

Flushing, NY 11358

 

Telephones:

 

Local 14-14B ………….(718) 939-0600

 

Fund Office …………….(718) 939-1489

 

Training Fund …………(718) 939-0600 Ext. 126

 

Training School……….(914) 930-7970

 

Website: www.local14funds.org

 

WAGE SCALE

 

July 1, 2026 – June 30, 2027

 

BENEFITS

 

Straight Off-Shift

 

Time Time

 

Compressors (Portable-3 or more),

 

Truck Compressor

 

(Engineer Driver), Tugger Machines,

 

Well Point Pumps, Chum Drill ……………………$ 62.68 $100.29

 

Boilers (High Pressure), Compressors,

 

Pumps (River Cofferdam) and

 

Welding Machines

 

(except where Arc is operated by

 

Members of Local 15), Push Button

 

Machines, All Engines, irrespective of

 

Power (Power Pac) used to drive

 

Auxiliary equipment, Air,

 

Hydraulic, etc……………………………………………$ 58.23 $ 93.17

 

UTILITY

 

Utility Compressors …………………………………..$ 57.84

 

Off-Shift Compressors. ……………………………… $ 73.02

 

Horizontal Boring Rig………………………………..$ 87.98 $140.77

 

PAVING

 

Asphalt Spreader, Autogrades

 

(C.M.I.), Roto-Mill ……………………………………$ 92.51 $148.02

 

Asphalt Roller …………………………………………..$ 90.14 $144.22

 

Asphalt Plants ………………………………………….. $ 76.11 $121.78

 

The Legal Holidays are: New Year’s Day, Martin Luther King Jr. Day,

 

President’s Day, Good Friday (Allied Building Metal & Cement

 

League only), Memorial Day, Independence Day, Labor Day,

 

Columbus Day, Election Day*, Veterans Day, Thanksgiving Day,

 

Day after Thanksgiving**, and Christmas Day.

 

*Election Day is a holiday for the following associations only:

 

Associated Brick Mason Contractors

 

Allied Building Metal Industries

 

**Day after Thanksgiving is a holiday for the following associations

 

only:

 

The Building Contractors Association

 

Contractors Association of Greater New York

 

General Contractors Association of NY Inc.

 

When an Engineer is employed in a payroll week in which aforesaid

 

holidays fall, the Engineer shall receive two (2) hours pay plus a two

 

(2) hour holiday prorated stamp for each day worked in said week

 

(i.e., one day – two hours, two days – four hours, three days – six hours,

 

four days – eight hours).

 

For the week of Thanksgiving/Day After Thanksgiving – Contact Union Hall.

 

CRANES: Crawler or Truck

 

100’ to 149’ Boom……………………$0.50 Per Hour Additional to

 

above Crane Rates

 

150’ to 249’ Boom……………………$0.75 Per Hour Additional to

 

above Crane Rates

 

250’ to 349’ Boom……………………$1.00 Per Hour Additional to

 

above Crane Rates

 

350’ to 450’ Boom……………………$1.50 Per Hour Additional to

 

above Crane Rates

 

ASSOCIATION OF NYC

 

CONCRETE PRODUCERS

 

40 Hour Week 7/1/26 to 6/30/27

 

Crane……………………………………………………………………..$ 98.93

 

Compressors……………………………………………………………$ 58.68

 

100’ to 149’ Boom……………………$ .75 Per Hour Additional to

 

above Crane Rates

 

150’ to 249’ Boom……………………$1.00 Per Hour Additional to

 

above Crane Rates

 

250’ to 349’ Boom……………………$1.25 Per Hour Additional to

 

above Crane Rates

 

350’ to 450’ Boom……………………$1.75 Per Hour Additional to

 

above Crane Rates

 

Asbestos Abatement…………………………………………………$ 59.24

 

Micro – traps (Negative Air Machines),

 

Vac-All Remediation System…………………………………….$ 78.97

 

Overtime shall be paid for at double time rates. On all overtime work, the

 

Engineer shall receive one (1) “D” Fringe Benefit Stamp for each hour.*

 

All work performed on Saturday and Sunday and on Legal Holidays as

 

outlined in the agreements shall be compensated at double time rates and

 

the Engineer shall receive one (1) “D” Fringe Benefit Stamp per hour.

 

On Off-Shift work, the Engineer shall receive one (1) “D” Fringe

 

Benefit Stamp per hour in addition to the hourly off-shift wage rate for

 

the first eight (8) hours. Any overtime shall be paid at double time rates.

 

*Building Work (New Projects)

 

Rack & Pinion and House Cars:

 

Overtime shall be paid for at time and one-half (1-1/2).

 

On all overtime work, the Engineer shall receive one (1)

 

“D” Fringe Benefit Stamp per hour.

 

 

 

EXCAVATION, FOUNDATION,

 

ROAD & HEAVY CONSTRUCTION WORK

 

40 Hour Week

 

7/1/26 to 6/30/27

 

Straight Off-Shift

 

Time Time

 

Tower Crane…………………………………………….. $119.67 $191.47

 

Backhoes, Power Shovels, Steel

 

Erection, Hydraulic Clam Shells, Moles

 

And Machines of a Similar Nature ………………$ 98.67 $157.87

 

Mine Hoists, Cranes, etc.

 

Used as Mine Hoists ………………………………….$101.86 $162.98

 

Gradealls, Keystone, Cranes (with

 

Digging Buckets), Bridge Cranes,

 

Trenching Machines, Vermeer Cutter

 

& Machines of a Similar Nature ………………….$ 99.37 $158.99

 

Pile Drivers and Rigs (Employing

 

Dock-Builders Foreman),

 

Derrick Boats, Tunnel Shovels ……………………$ 97.41 $155.86

 

All Drills, and Machines of a Similar

 

Nature………………………………………………………$ 93.50 $149.60

 

Back Filling Machines,

 

Cranes, Mucking Machines,

 

Dual Drum Pavers……………………………………..$ 95.27 $152.43

 

Mixers (Concrete with Loading

 

Attachment), Concrete Pavers

 

Cableways, Land Derricks,

 

Power Houses (Low Pressure Units) ……………$ 92.51 $148.02

 

Concrete Pumps, Concrete Plant,

 

Stone Crushers, Double Drum Hoist,

 

Power Houses (Other than above) ……………….$ 90.57 $144.91

 

Roller……………………………………………………….$ 90.14 $144.22

 

Concrete Mixer …………………………………………$ 86.55 $138.48

 

Elevators ………………………………………………….$ 80.83 $129.33

 

Concrete Breaking Machines, Hoists

 

(Single Drum), Load Masters,

 

Locomotives and Dinkies over 10 tons,

 

Hydraulic Crane-Second Engineer ………………$ 82.63 $132.21

 

On Site Concrete Plant

 

Engineer, On Site Asphalt Plant

 

Engineer & Vibratory Console…………………….$ 83.23 $133.17

 

Barrier Mover, Barrier Transport

 

And Machines of a Similar Nature ………………$ 74.63 $119.41

Categories: