OPERATING ENGINEERS LOCAL #14 – 14B Wage Rates and Fringe Benefits 7/1/2025 to 6/30/2026
JURISDICTION: New York City
$ $ $ $ $ $ $ $ $ $ | 42.2810.500.506.301.152.480.104.5016.500.25 | |
WAGES – HOURLY RATE: | 7/1/2025 | |
TO | ||
6/30/2026 | ||
Double Drum Single Drum , 4 Pole hoist Relief Eng/Crane erection & dismantle House Cars and Rack & Pinion House Cars (New Projects) “Basic Crane “Basic Wage Rate ***”B” Rate Lead Engineers/ Working Steward CONTRIBUTIONS – FOR HOURS PAID (EXCEPT AS NOTED): Annuity Fund ****IAP Fund (per hours worked) Pension Fund (per hours worked) Training Fund Union Assessment (tax) Defense Fund (tax) Vol. Annuity (tax) Welfare Fund LMCTF | $ $ $ $ $ $ $ $ $ | 92.3279.7080.5663.2750.3997.7972.4654.1285.88 |
*Stone Derrick, Cranes (up to 100′), Hydraulic Cranes
**Fork Lifts, Plaster (Platform Machine), Plaster Bucket Concrete Pumps and all other equipment used to Hoist Material.
***Compressors, Welding Machines, (Cutting Concrete – Tank Work), Paint Spraying,
Sand Blasting, Pumps (with the exclusion of Concrete Pumps),
All Engines irrespective of power (Power Pac) used to drive Auxiliary Equipment, Air, Hydraulic, Jacking System & Boliers.
““Separate check for IAP Fund payable to the “Industry Advancement Program”, to be presented at same time purchase of stamps is made at Union Fund Office.
CRANE:
Boom rates, crawler or truck
Additional hourly rates to be added to “Basic Crane Rate” listed above:
100′- 149′ 150′ -249′ 250′ – 349′ 350′ -450′ Tower Crane | = = = = = | $ $ $ $ $ | 1.752.002.252.752.00 |
OPERATING ENGINEERS LOCAL #14-14B – CON’T
*The Engineer on a climbing crane shall receive an additional one hour per day climbing time at the double time rate. Climbing time shall start when the equipment is power activated.
LUNCH: If he remains in the cab
If he works any time during lunch
= = | one half hour’s wage at double timeone hour’s wage at double time |
SURETY BOND:
Number of Engineers Employed
1 to 10
11 to 30
over 30
Amount of Surety Bond $ 10,000.00 $ 20,000.00 $ 50,000.00
WORK HOURS:
*7 hour da y 35 hour week | Between 8:00 a.m. and 4:00 p.m. -1/2 hour lunch7 hours actual machine running time with machine ready to start at 8:00 a.m. |
*lf Engineer works with mechanics of a trade who work an 8 hour day – Engineer will | |
also work 8 hours at straight time. | |
NOTE: | If hoisting for concrete contractor exclusively, and is employed only one |
or two consecutive days within 5 consecutive working days, he will receive a minimum of 3 days pay for each p payroll week.
OVERTIME:
Conditions: : Excess of 7 hours in any one day, Saturday, Sundays and Holidays
Wages: Fringes: | Double time (Except Rack & Pinion and House Cars, bid after 7/1/2011, are at time and a half)Welfare, Annuity, Training, Union Assessment, Vol. Annuity and DefenseFunds are paid double for overtime hoursPension and IAP Funds are paid at straight time for all hours worked. |
PAID HOLIDAYS: New Year’s Day Lincoln’s Birthday Presidents’ Day Thanksgiving Day
Memorial Day Columbus Day
Fourth of July Veteran’s Day
Labor Day Friday after Thanksgiving
Christmas Day